What term describes the set of phase allocations for a given timing sequence equaling the sum of green, pedestrian clearance, yellow, and all-red times?

Prepare for the ITE Traffic Bowl Fundamentals and Engineering Test with our engaging quiz. Study with flashcards and multiple choice questions, each with hints and explanations. Get ready to excel in your test!

Multiple Choice

What term describes the set of phase allocations for a given timing sequence equaling the sum of green, pedestrian clearance, yellow, and all-red times?

Explanation:
Distributing one fixed cycle length among the various movements is what the split describes. Each phase has a duration that includes green time plus any pedestrian clearance, yellow time, and the all-red interval before the next phase. When you list these allocations for every phase in the timing sequence, their total adds up to the cycle length. This distribution—how much of the cycle is given to each phase—is called the split. The cycle is the total time for the whole sequence; a phase is a single movement’s active interval; an offset is the time shift between signals. So the term that fits is split.

Distributing one fixed cycle length among the various movements is what the split describes. Each phase has a duration that includes green time plus any pedestrian clearance, yellow time, and the all-red interval before the next phase. When you list these allocations for every phase in the timing sequence, their total adds up to the cycle length. This distribution—how much of the cycle is given to each phase—is called the split. The cycle is the total time for the whole sequence; a phase is a single movement’s active interval; an offset is the time shift between signals. So the term that fits is split.

Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy